原版高清偷拍视频无码|国产最大成人亚洲精品|国产成人综合久久精品推|乱码字幕亚洲综合小综合|在线亚洲精品福利网址导航|国产精品久久久久久久影院|国产日韩av综合精品第一页|亚洲AV秘 无码一区二区小说

86 536 6132678
Industry News

Home/News/Industry News
  • Chenyu News
  • Industry News
  • Industry News

  • Maintenance of electrical equipment
    Maintenance of electrical equipment

    The secondary power equipment constitutes a system, not just the device itself, such as AC, DC, control circuits, etc. Due to the lack of monitoring methods for some circuits, real-time technical analysis and judgment of equipment status cannot be carried out. Therefore, in terms of the current application status of electrical secondary equipment, strictly speaking, most protections do not meet the conditions for condition based maintenance. The planned maintenance system adopted by power equipment in the power system has serious defects, such as frequent temporary maintenance, insufficient or excessive maintenance, blind maintenance, etc. This causes countries around the world to spend huge amounts of money on equipment maintenance every year.

    19

    2024-01

  • How to deal with insulation damage in transformers?
    How to deal with insulation damage in transformers?

    According to the nature of maintenance work, transformer maintenance is divided into major and minor repairs. Traditionally, oil immersed transformers that require oil suspension (or lifting the bell cover) for maintenance are called major repairs; If there is no need to drain oil, do not lift the core (lift off the bell cover), and only perform external maintenance, oil replenishment, and oil treatment, it is called minor maintenance.

    19

    2024-01

  • Transformer installation steps and process
    Transformer installation steps and process

    Transformers can be directly thrown into the transformer room using a car crane, or temporary tracks can be set up with wooden tracks. Three steps and lifting chains can be used to lift the transformers onto the temporary tracks, and then the lifting chains can be used to pull them into a suitable position indoors. Transformers should pay attention to their orientation and distance from the wall, which should be consistent with the drawings. The allowable error is ± 25mm. If there are no markings on the drawings, the horizontal distance from the wall should not be less than 800mm, and the distance from the door should not be less than 1000mm. Installation of transformer stand: Install transformer on double pole with a root gap of 2m between the two poles. Buried at a depth of 2m. The distribution transformer stand is fixed to two poles with two or four channel steels, and the height of the stand from the ground is not less than 2.5m. The plane slope of the stand is not more than 1/100. The waist railing should be wrapped with iron wire with a diameter of no less than 4mm for more than two turns, and the winding should be firm. The distance between the waist railing and the live part should not be less than 0.2m. At the same time, dust covers are installed on the high-voltage column heads of the transformer, and warning signs are hung on the transformer.

    19

    2024-01

  • Total 3

    魯公網(wǎng)安備 37078102001141號

    万山特区| 彝良县| 永寿县| 舟山市| 鸡东县| 连平县| 尚志市| 新和县| 巴中市| 佛坪县| 大方县| 昌平区| 大港区| 民丰县| 信阳市| 汤原县| 修武县| 克东县| 饶阳县| 微山县| 沈丘县| 阿拉善右旗| 阿勒泰市| 达孜县| 阜新| 沈阳市| 石阡县| 宝坻区| 若尔盖县| 武隆县| 馆陶县| 新河县| 囊谦县| 秦安县| 巨野县| 新干县| 海阳市| 临城县| 环江| 博客| 灵川县|